• Via Scorpione, n.20/22 - 09016 Iglesias (SU)

This post is also available in: Italiano

WORKS

2020

SALINI IMPREGILO/NGE GENIE CIVIL

works on the soldering of head and shields on TBM/METRO PARIS
2018

CARBOSULCIS

various carpentry, metal works
2017

SELI TECNOLOGYES

Revamping testa TBM cantiere Shanxi Cina
2017

CARBOSULCIS

various carpentry, metal works
2014

ENAS

extraordinary maintenance of the electromechanics settings of the Dams: Bidighinzu, Sos Canales , Bau Pressiu.
2003

SPA SRL, OLAI ORGOSOLO DAM (NU), CONSOTIUM of GOVOSSAI:

utilization of intake structure DN1000 and emptying below and exhaustion.
2012

ENAS

extraordinary maintenance of the hydraulic settings of Flumendosa river Dam at Nuraghe Arrubiu and on Mulargia Dam at Monte Su Rei.
2010

ALGHERO CITY MUNICIPALITY

final infrastructural operations for conservation, valuation, and fruition of the Green Cave (Grotta Verde).
2008

METRO B1 SELI SPA, ROME

works on the soldering of head and shields on TBM HERRENKNECHT.
2008

CONSORTIUM ATB – SELI SPA, BRESSANONE

works on the soldering of head and shield on TEM WIRTH.
2008

CONSORTIUM for REMEDIATION of SARDEGNA MERIDIONALE

oil eletrical system and remote controls of the Rio Leni Dam, Monte Arbus.
2006/07

CONSORTIUM for REMEDIATION at GALLURA, CALAMAIU DAM on RIVER LISCIA

work on completion of the public lighting and maintenance on existing operations; works regarding authorization to obtain maximum flooding.
2006

ABBANOA SPA

maintenance on ground sluice at Olai Dam.
2005/06

CARBON SULCIS SPA

various carpentry, metal works
2004/05

ENEL GREEN POWER HYDROELECTRICAL PLANT – CEDRINO LAKE (NU)

project, supply and assembly of penstock.
2004/05

ENEL SPA, HYDROELECTRICAL PLANT LAKE MACCHERONIS POSADA (NU)

project, supply, assembly of strengthened conduit and relative accessory operations.
2004/05

ENEL GREEN POWER, HYDROELECTRICAL PLANT - CEDRINO LAKE (MU)

project, supply and assembly of central drainage system.
2004

ITALCEMENTI – SELI SPA, MONTEGIGLIO TUNNEL (BG)

assembly of the hydraulic lifting system and the ventilation system for advancement.
2003/04

ENEL GREEN POWER, CANTONIERA BUSACHI DAM (OR)

assembly and welding of penstock DN 3000 on central TIRSO.
2004

ENEL GREEN POWER HYDROELECTRIC PLANT at TIRSO 2 (OR)

project, supply and assembly of central drainage system.
2004

ENEL GREEN POWER HYDROELECTRIC PLANT at TIRSO 1 (OR):

supply & assembly of central drainage system.
2003/04

ENEL GREEN POWER, CANTONIERA BUSACHI DAM (OR)

assembly and welding of penstock DN 3500 on central TIRSO 2.
2003

CENTRAL METRO SCARL METRO TORINO

assembly and welding equipment T.B.M.
2002

G.T.O. SPA OTTANA (NU)

construction and assembly of the pipe-line to supply steam, heat, water etc.
2002

SELI SPA VORTEX HYDRA, DIGA DEL MENTA (RC):

assembly of intake structure DN 1600.
2001

SANTA VITTORIA DAM OR CONSORTIUM for REMEDIATION of ORISTANESE

extraordinary maintenance on irrigation works and sluices, gravel, with revision of the relative hydraulic cylinders.

2001

ALCOA EUROPE SPA

various maintenance at the Iglesias (CI) establishment.
2001

ALTO TEMO DAM - CONSORTIUM for REMEDIATION of NURRA

providing adequate room for manoeuvring and draining, furnishing and assembling hydraulic cylinder and various maintenance, at Roccadoria Monteleone (SS).

2000

A.E.M. TORINO – RIVA CALZONI

work on the barricading for the central hydro- electrical system at San Mauro Torinese (TO).
1999

ABB ASTON POWER – UDINE

pipe-line assembly, pylons, adders, oil dynamic system etc, system for fume elimination “Acciaierie Von – Moos” Lucerna (CH).
1999

SARDA SILICATI

work on the metal structure and tubing on the production system at Florinas (SS).
98/2000

SIT MORTARA (MT) GRUPPO SAVIOLA

assembly of manufacturing systems such as: shaping /forming, redler coveyor, building and assembling stairway, air system piping, water, structural parts.
1998

E.A.F. CAGLIARI

work on conduit operations for the transport of water.
97/2001

SIA SPA VIADANA (MN) GRUPPO SAVIOLA

production system part such as: work on the procession and revision of production systems such as: conveyors belts, redler coveyor, forming, gear reduction.
1996

PANTEC gruppo Frati Mantova

construction and assembly of production plant parts such as: forming machine, redler, construction and assembly of stairs, air and water vibrations, chippers overhaul, structural parts of the plant.