SALINI IMPREGILO/NGE GENIE CIVIL METRO PARIS
SALINI IMPREGILO/NGE GENIE CIVIL METRO PARIS – Saldature testa TBM/METRO PARIS
This post is also available in: Italiano
Lavori di assemblaggio e saldatura testa e scudi su TBM WIRTH.
SALINI IMPREGILO/NGE GENIE CIVIL METRO PARIS – Saldature testa TBM/METRO PARIS
(2003/2004) ENEL GREEN POWER, BUSACHI CANTONIERA DAM (OR): assembly
Dn 3000 penstocks on Tirso 1 power plants.
(2003/2004) ENE
(2004) ITALCEMENTI – SELI SPA, MONTEGIGLIO GALLERY (BG): assembly of the segment hydraulic lifting system and ventilation system f
(2006/2007) CONSORTIUM for REMEDIATION at GALLURA, CALAMAIU DAM on RIVER
LISCIA : work on completion of the public lighting and m
Details: finalization and positioning of the Arch.
(2008) CONSORTIUM for REMEDIATION of SARDEGNA MERIDIONALE: repair oil eletrical system and remote controls of the Rio Leni Dam, Mo
(2003) CENTRAL METRO SCARL METRO TORINO: assembly and welding equipment T.B.M.
final infrastructural operations for conservation, valuation, and fruition of the Green Cave (Grotta Verde).
Read MoreFor ENEL PRODuzione SPA, TORPE '(NU) Embankment and penstock DN 1200 Maccheronis dam hydroelectric power plant
Read MoreDORGALI (NU) penstock DN1500. Hydroelectric plant at PEDRA E H’OTHONI DAM
Read MoreMONTE DI DEU dam bottom discharge
Read Moreassembly and welding of penstock DN 3000 on central TIRSO.
Read MoreFORDONGIANUS (OR) penstock DN 3500, Hydroelectric plant at TIRSO II Dam
Read Moreextraordinary maintenance of the hydraulic settings of Flumendosa river Dam at Nuraghe Arrubiu and on Mulargia Dam at Monte Su Rei
Read More